Tuesday, 17 February 2026

TT:120 station

 


This was always going to be the biggest job of the build. Everything else got taken down and put to one side. It was going to need laser-like focus. OK that's  rather over blowing it, but I did clear the bench a little and just got on with it. It's not that it's particularly complicated, more that with a station house and station building as one lump, all tied together with a long canopy, it is just large, not physically at 2.54mm to the foot, just a lot of it. Here the first bit of the structure is going together with the A part of the platform buildings and the flat part of the station house.

I'm just about getting the hang of these ply kits now.

As part of the great shift, I have re-opened and Instagram account. This may partially replace this in that it is more immediate. They have different properties and this is better for the longer form pieces. 

No comments:

Post a Comment